Hong Kong
Institute of Medical Laboratory Sciences
Quality Assurance Programme Ltd.
2014 Time Schedule
Task
|
Survey |
|||
First |
Second |
Third |
Fourth |
|
Date
of Assembly |
15.02.14 |
10.05.14 |
09.08.14 |
08.11.14 |
Survey
Material Dispatch |
17.02.14 |
12.05.14 |
11.08.14 |
10.11.14 |
Return
of Results for AFB, HS, MM and VS |
03.03.14 |
26.05.14 |
25.08.14 |
24.11.14 |
Return
of Results for NGST |
03.03.14 |
- |
25.08.14 |
- |
Return
of Results for VNAT |
- |
28.05.14 |
- |
- |
Return
of Results for AP |
05.03.14 |
28.05.14 |
27.08.14 |
26.11.14 |
On-line
Posting of Preliminary Reports |
10.03.14 |
02.06.14 |
01.09.14 |
01.12.14 |
Report
Dispatch |
10.05.14 |
09.08.14 |
08.11.14 |
07.02.15 |
This is a tentative schedule. HKIMLSQAP reserves the right to change the schedule without prior notice to the participants.
Contact us: info@hkimlsqap.org
The Chairman
Quality Assurance Programme Committee
Hong Kong Institute of Medical Laboratory Sciences Ltd.
Flat 1711, 17/F, Block C, Bell House,
525 - 543 Nathan Road, Yaumatei, Kowloon, Hong Kong
Last updated on 2013/11/03.