Hong Kong
Institute of Medical Laboratory Sciences
Quality Assurance Programme Ltd.
2013 Time Schedule
Task
|
Survey |
|||
First |
Second |
Third |
Fourth |
|
Date
of Assembly |
23.02.13 |
04.05.13 |
03.08.13 |
02.11.13 |
Survey
Material Dispatch |
25.02.13 |
06.05.13 |
05.08.13 |
04.11.13 |
Return
of Results for AFB, HS, MM and VS |
11.03.13 |
20.05.13 |
19.08.13 |
18.11.13 |
Return
of Results for NGST |
11.03.13 |
- |
19.08.13 |
- |
Return
of Results for VNAT |
- |
22.05.13 |
- |
- |
Return
of Results for AP |
13.03.13 |
22.05.13 |
21.08.13 |
20.11.13 |
On-line
Posting of Preliminary Results |
18.03.13 |
27.05.13 |
26.08.13 |
25.11.13 |
Report
Dispatch |
04.05.13 |
03.08.13 |
02.11.13 |
15.02.14 |
This is a tentative schedule. HKIMLSQAP reserves the right to change the schedule without prior notice to the participants.
Contact us: info@hkimlsqap.org
The Chairman
Quality Assurance Programme Committee
Hong Kong Institute of Medical Laboratory Sciences Ltd.
Flat 1711, 17/F, Block C, Bell House,
525 - 543 Nathan Road, Yaumatei, Kowloon, Hong Kong
Last updated on 2012/11/12.